In collaboration with Scotch College Property Pty Ltd, Brown Falconer Architects, our dedicated team in Mount Gambier delivered the new Beyond Early Learning Centre (ELC). This 600m² state-of-the-art facility, constructed on a Greenfield site, was designed to provide a safe, nurturing, and stimulating environment for children aged 0-5 years.
The new facility features a welcoming entry, spacious staff administration areas, a fully equipped commercial kitchen, laundry, and ample parking. Thoughtfully designed to cater to the needs of young children, the centre includes a baby change area, bathing facilities, bottle preparation space, a dedicated sleep room, and convenient storage. Additionally, secure, landscaped outdoor play areas are enhanced with natural play spaces, a variety of playground equipment, and vibrant garden beds.
Throughout the project, our team worked closely with the architect to resolve design challenges and identify opportunities for efficiency, including adopting a prefab steel frame structure to reduce costs and streamline construction. This collaborative approach enabled us to save six weeks in the early stages, ensuring a timely completion of the project.