This project comprised the construction of a new office and warehouse space for Micro X. The construction was predominantly out of cool room panels, however it also included transportable pods and annexes off the sides of the assembly area, and also their existing office space (also constructed out of transportable pods).
The transportable pods were pre-fabricated off site and services and linings were installed onsite. The annexes were externally clad with powder coated folded aluminium panels. The transportable pods were for workshop space, workstation areas and an X-ray room.
The new office area adjacent the new assembly was two levels that contained mezzanine level for a meeting room and the lower level contained a workstation zone, meeting room and another X-ray room.